TODO
From CarrottElectric
TODO
| | Throttle Pedal |
| | Brake Pipes |
| | Fold lip on and install rear battery box |
| | Install adjustable rear suspension |
| | Make motor mounts |
| | Measure driveshafts |
| | Respline driveshafts |
| | Build gearbox |
| | Fettle adapter plate |
| | Fabricate battery hold downs |
| | Install rear subframe |
| | Install adjustable front suspension |
| | Install front subframe |
| | Install motor & gearbox |
| | Install Driveshafts |
| | Mount inverter |
| | Mount contactor box |
| | Mount Fuse |
| | Connect handbrake |
| | Make motor torque arm |
| | Mount brake master cylinder |
| | Install battery cover |
| | Mount EVision in dashboard |
| | Bleed brakes |
| | Mount regen sensor |
| | Bring EVision serial port into cabin |
| | Connect speed signal to EVision |
| | Move inverter |
| | Acquire Air Conditioning compressor |
| | Fix EVision serial port |
| | Clean & paint rear subframe |
| | Acquire kWh meter |
| | Clean and paint rear battery box |
| | Clean and paint rust above rear subframe |
| | Acquire RCD |
| | Acquire 10A circuit breaker |
| | Improve charging plug adapter |
| | Reassemble and reinstall rear subframe |
| | Tidy up low voltage wiring |
| | Pack rear battery box |
| | Improve rear battery box compression |
| | Redesign & fabricate motor mounts |
| | Charge auxiliary battery |
| | Fabricate inverter brackets |
| | Secure traction cables |
| | Tighten traction connections |
| | Connect contactor box |
| | Mount EVision shunt and brains |
| | Write presentation |
| | Bleed Brakes |
| | LCA2010 |
| | KillaCycle Down Under 2010 |
| | Cooling System |
| | Cabling |
| | Repair puncture |
| | Replace tyre |
| | Mount contactors |
| | Mount Inverter Drill Holes Make spacers weld captive nuts |
| | Mount Aux Battery |
| | Connect direction switch |
| | Connect fuse |
| Adjust brake light switch | |
| Check brake lights come on before regen | |
| | Install traction cable Improve hangers Finish crimping |
| Install cooling system | |
| | Package BMS |
| | Write BMS software |
| | Improve Throttle Pedal installation. Need 2 1/4" UNF 1/4 bolt. |
| Clean 30 cells and bring up 6 BMS boards | |
| Improve cable hanger under motor | |
| Clean 30 cells and bring up 6 BMS boards | |
| Sort out restraint system | |
| Put together charger control box | |
| Protect traction cable at entry to battery box | |
| Clean and paint rust in rear valence | |
| Tidy up scratches in underbody paint | |
| Locate and install Air Conditioning components | |
| | Design & fabricate front battery racks |
| Clean & paint front subframe | |
| Tidy up High Voltage Wiring | |
| Select Charging Plug | |
| Design and make Charging Plug arrangement on body | |
| Repackage Air Conditioning inverter | |
| Mount charger | |
| Remove unnecessary gears |

