TODO

From CarrottElectric

Jump to: navigation, search

TODO

Throttle Pedal
Brake Pipes
Fold lip on and install rear battery box
Install adjustable rear suspension
Make motor mounts
Measure driveshafts
Respline driveshafts
Build gearbox
Fettle adapter plate
Fabricate battery hold downs
Install rear subframe
Install adjustable front suspension
Install front subframe
Install motor & gearbox
Install Driveshafts
Mount inverter
Mount contactor box
Mount Fuse
Connect handbrake
Make motor torque arm
Mount brake master cylinder
Install battery cover
Mount EVision in dashboard
Bleed brakes
Mount regen sensor
Bring EVision serial port into cabin
Connect speed signal to EVision
Move inverter
Acquire Air Conditioning compressor
Fix EVision serial port
Clean & paint rear subframe
Acquire kWh meter
Clean and paint rear battery box
Clean and paint rust above rear subframe
Acquire RCD
Acquire 10A circuit breaker
Improve charging plug adapter
Reassemble and reinstall rear subframe
Tidy up low voltage wiring
Pack rear battery box
Improve rear battery box compression
Redesign & fabricate motor mounts
Charge auxiliary battery
Fabricate inverter brackets
Secure traction cables
Tighten traction connections
Connect contactor box
Mount EVision shunt and brains
Write presentation
Bleed Brakes
LCA2010
KillaCycle Down Under 2010
Cooling System
Cabling
Repair puncture
Replace tyre
Mount contactors
Mount Inverter
Drill Holes
Make spacers
weld captive nuts
Mount Aux Battery
Connect direction switch
Connect fuse
Adjust brake light switch
Check brake lights come on before regen
Install traction cable
Improve hangers
Finish crimping
Install cooling system
Package BMS
Write BMS software
Improve Throttle Pedal installation. Need 2 1/4" UNF 1/4 bolt.
Clean 30 cells and bring up 6 BMS boards
Improve cable hanger under motor
Clean 30 cells and bring up 6 BMS boards
Sort out restraint system
Put together charger control box
Protect traction cable at entry to battery box
Clean and paint rust in rear valence
Tidy up scratches in underbody paint
Locate and install Air Conditioning components
Design & fabricate front battery racks
Clean & paint front subframe
Tidy up High Voltage Wiring
Select Charging Plug
Design and make Charging Plug arrangement on body
Repackage Air Conditioning inverter
Mount charger
Remove unnecessary gears
Personal tools