TODO
Jump to navigation
Jump to search
TODO
Take apart rear | 10 | |
Change battery hold-down system in boot | 40 | |
Mount inverter replace rear bolts |
2 | |
Make better fuse mount for boot battery box | 10 | |
Repackage BMS on battery in the boot | 25 | |
Design & fabricate front battery box and mounting system | ? | |
Install traction cable Protect traction cable at entry boot Improve hangers Shorten cable Make motor junction box |
10 10 3 20 | |
Take apart front | 10 | |
Motor mounts Talk to certifier Weld front mount Remake rear mount Remake left mount |
2 30 10 | |
Move left brake hose | 10 | |
Clean up front subframe | 40 | |
Reassemble front | 12 | |
Paint rear welds reassemble rear |
10 20 | |
Build battery box for rear seat | ||
Adjust brake light switch | ||
Check brake lights come on before regen | ||
Cooling System | ||
Improve Throttle Pedal installation. Need 2 1/4" UNF 1/4 bolt. | ||
Make speedo work | ||
Put together charger control box | ||
Write BMS Software | ||
Tidy up scratches in underbody paint | ||
Locate and install Air Conditioning components | ||
Clean & paint front subframe | ||
Tidy up High Voltage Wiring | ||
Select Charging Plug | ||
Design and make Charging Plug arrangement on body | ||
Repackage Air Conditioning inverter | ||
Remove unnecessary gears | ||
Mount charger | ||
Sort out restraint system | ||
Connect direction switch | ||
Mount Aux Battery | ||
Mount contactors | ||
Replace tyre | ||
Repair puncture | ||
KillaCycle Down Under 2010 | ||
LCA2010 | ||
Bleed Brakes | ||
Write presentation | ||
Mount EVision shunt and brains | ||
Connect contactor box | ||
Tighten traction connections | ||
Secure traction cables | ||
Fabricate inverter brackets | ||
Charge auxiliary battery | ||
Redesign & fabricate motor mounts | ||
Improve rear battery box compression | ||
Pack rear battery box | ||
Tidy up low voltage wiring | ||
Reassemble and reinstall rear subframe | ||
Improve charging plug adapter | ||
Acquire 10A circuit breaker | ||
Acquire RCD | ||
Clean and paint rust above rear subframe | ||
Clean and paint rear battery box | ||
Acquire kWh meter | ||
Clean & paint rear subframe | ||
Fix EVision serial port | ||
Acquire Air Conditioning compressor | ||
Move inverter | ||
Connect speed signal to EVision | ||
Bring EVision serial port into cabin | ||
Mount regen sensor | ||
Bleed brakes | ||
Mount EVision in dashboard | ||
Install battery cover | ||
Mount brake master cylinder | ||
Make motor torque arm | ||
Connect handbrake | ||
Mount Fuse | ||
Mount contactor box | ||
Mount inverter | ||
Install Driveshafts | ||
Install motor & gearbox | ||
Install front subframe | ||
Install adjustable front suspension | ||
Install rear subframe | ||
Fabricate battery hold downs | ||
Fettle adapter plate | ||
Build gearbox | ||
Respline driveshafts | ||
Measure driveshafts | ||
Make motor mounts | ||
Install adjustable rear suspension | ||
Fold lip on and install rear battery box | ||
Brake Pipes | ||
Throttle Pedal |